U.S.- Pakistan Center for Advanced Studies in Energy (USPCAS-E)

U.S.- Pakistan Center for Advanced Studies in Energy (USPCAS-E)

University of Engineering and Technology Peshawar
Media

U.S.-Pakistan Center for Advanced Studies in Energy (USPCAS-E) at the University of Engineering and Technology (UET) Peshawar hosted the second National Conference on Green Energy Technologies in Peshawar on 12th April, 2018. The conference provided a platform for energy experts and scientists to discuss innovation in solar, wind, geothermal and hydro energy technologies, and analyze the current state of power engineering, energy policy, and thermal energy systems engineering in Pakistan.

Khyber Pakhtunkhwa Minister of Finance Mr. Muzafar Said, presided over the occasion. He expressed his appreciation for USAID’s support to establish USPCAS-E.

The Pro Vice-Chancellor for UET Peshawar Professor Dr. Noor Muhammad, speaking at the conference, reaffirmed his commitment to make UET Peshawar an entrepreneurial university, which will catalyze a knowledge-based economy. He added that it is an honor to partner with USAID to develop a Center for Advanced Studies in Energy. He acknowledged the support of the provincial government.  
 
The USAID-supported USPCAS-E is a joint initiative between the National University of Sciences and Technology (NUST), UET Peshawar, and Arizona State University to develop real world solutions to Pakistan’s energy challenges and to educate a new generation of skilled engineers. The partnership is strengthening academic programs in energy, establishing channels to facilitate local and international networking, widening access to energy-related professions for women and economically disadvantaged students, and establishing a regular policy dialogue between Pakistan’s public and private energy stakeholders.

 

USPCAS-E UET Peshawar is pleased to announce Summer Internships Starting in 1st week of July lasting for 4-6 Weeks. Interested students/applicants are requested to identify their relevant fields and apply for the internships Programs.

Internship Opportunities in following organizations are available:

National Transmission and Dispatch Company (NTDCL), Shahi Bagh Grid

Internship Ref:

NTDCL EL 101

National Transmission & Dispatch Company (NTDC) was incorporated on 6th November, 1998 and commenced commercial operation on 24th December, 1998. It was organized to take over all the properties, rights and assets obligations and liabilities of 220 KV and 500KV Grid Stations and Transmission Lines/Network owned by Pakistan Water and Power Development Authority (WAPDA). NTDC operates and maintains fourteen 500 KV and thirty eight 220 KV Grid Stations, 5110.48 km of 500 KV transmission line and 9686.32 km of 220 KV transmission line in Pakistan.

Objectives: Understand the operations of transmission grid Learn the operational SOPs of NTDCL

Duration of Internships: 4-6 weeks

Pakistan Aeronautical Complex (PAC), Kamra

Internship Ref:

PAC TH 102

Pakistan Aeronautical Complex (PAC) is an organization which comprises of four co-located factories which virtually take care of maintenance of all operational assets of Pakistan Air Force (PAF) for the purpose of effective control and efficient working.

Objectives: Work on different projects on development of indigenous aircraft (details will be confidential in nature)

Duration of Internships: 4-6 weeks

Pakhtunkhwa Energy Development Organization (PEDO)

Internship Ref:

PEDO ELMA 103

PEDO is the major organization of development of power projects in KP

Objectives: Understand the major projects being undertaken by PEDO, Learn Operational SOPs of PEDO, Visit PEDO project sites.

Duration of ips: 4-6 weeks

Peshawar Electric Supply Company (PESCO)

Internship Ref:

PAC ELMAEMS 104

Peshawar Electric Supply Company (PESCO), located in Peshawar provides service of power distribution to over 2.6 million consumers of all civil districts of Khyber Pukhtunkhwa, Pakistan. At PESCO networks, we own and maintain Khyber Pukhtunkhwa’s electricity distribution system via 132, 66, 33KV sub-transmission lines, sub-stations and 11KV & 440V low tension lines with distribution transformers that deliver electricity to your home or business.

Objectives: Understand the operations of PESCO Control Center, Learn the SOPs of PESCO

Duration of Internships: 4-6 weeks

Warsak Hydal Power Plant

Internship Ref:

WHPP ALL105

Warsak Power Station is a monument of the friendship of Canada and Pakistan. Warsak Power Station was built in two phases as co-operative effort between the two Governments. Construction of 1st phase started in 1951 and in 1960-61, four generating units of 40 MW capacity each were commissioned. The 2nd phase began in 1975 and two more 41.48 MW units were commissioned respectively in 1980-81. The total installed capacity thus amounted to 242.96 MW.

Objectives: Understand operation of Hydal Power Plant, Get orientation of different departments of a Hydal Power plant, Learn Operational SOPs of WAPDA.

Duration of Internships: 4-6 weeks

Apply Online

Download list from attachment link below.

Download list from attachment link below.

Page 6 of 18

Connect with us

Sector B/3, Plot D, Near Sui Gas Office, Opposite ILM School, Hayatabad, Phase 5, Peshawar, Khyber Pakhtunkhwa Pakistan.

  • Phone+92-91-9217480 & 9217654 & 9219558

  • Phone+92-91-9219581

  • Email uspcase@uetpeshawar.edu.pk